  • Westconnex M5N Arncliffe West D-Wall Shaft
  • LRB 255 working on corner piles

Project Outline

CPB Contractors Dragados Samsung Joint Venture is undertaking the design and construct of the Westconnex New M5 Project. The installations of temporary DW shaft section and sheetpiles at Arncliffe were awarded to Avopiling Australia

Scope of Works

Avopiling scope is to supply all plant, equipment, labour and materials for the construction of a 12.00 meter diameter diaphragm wall shaft with panel thickness of 1.00 meter to depths reaching 30.00 meters with a required vertical accuracy of 0.5% and the installation of twin AZ36 sheets to lengths of 20.00 meters to an approximate area of 8,500 square meters.

Industry leading techniques and equipment

Our clients

  • Roads & Maritime
  • Department of Main Roads & Transport
  • Main Roads Western Australia
  • Lend Lease
  • Leighton
  • Thiess
  • Meriton
  • Queensland Urban Utilities
  • Transport for NSW
  • McConnell Dowell
  • OHL
  • Acciona Australia
  • Probuild
  • Brookfield Multiplex