QGC Upstream Overhead Transmission Lines Project

Project Outline

Products / Services
Bored Piles

The project is made up of 108 transmission line towers which are approximately 300 meters apart. Transmission towers are to be supported by drilled monopiles casted to depths from 5.00 meters to 14.00 meters.

Scope of Works

CPB Contractors engaged Avopiling QLD to build the tower supports, establish the construction logistics, set and fix hold down bolts into pile.