Northlink WA Stage 3
Project Outline
Products / Services
Bored PilesMain Roads Western Australia has selected CPB Contractors to design and construct the final section of the Northlink Highway in WA from Ellenbrook to Muchea.
Scope of Works
CPB Contractors engaged Avopiling WA to design and construct the foundation of Bridges 1795, 1796, 1798 and 1799. Avopiling opted to construct bored piles using polymer drilling fluid for 75No-750mmØ x 15.00 metres and 72No-1200mmØ x 18.00 metres.