Northmead Pump Station Shafts
Project Outline
Interflow contracted Avopiling Australia to provide three open bored shafts to allow Interflow to construct a temporary sewerage pump station.
Scope of Works
Installation of 2No 4000mmØ and 1No 2500mmØ and permanent casings drilled to 14.5 metres in depth