QGC Upstream Overhead Transmission Lines Project
Project Outline
Products / Services
Bored PilesThe project consist of 108 transmission line towers which are approximately 300 meters apart. Transmission towers are to be supported by drilled monopiles casted to depths from 5.00 meters to 14.00 meters.
Scope of Works
CPB Contractors engaged Avopiling QLD to build the tower supports, establish the construction logistics, set and fix hold down bolts into pile. The project involves installation of 4No-1500mmØ x 5.00 metres deep, 73No-2100mmØ x 10.10 metrers deep and 31No-2400mmØ x 13.60 metres deep bored piles.