Toowoomba Second Range Crossing
Project Outline
Products / Services
Bored PilesThe project includes pile construction for 16 separate bridges traversing the entire alignment of the by-pass. Piling work commenced in September 2016 and would require three drilling rigs to finish in May 2017.
Scope of Works
Piling works awarded by Nexus Delivery to Avopiling QLD to construct bored piers 900mmØ, 1200mmØ and 1500mmØ all with permanent casings, depths ranging from 17 meters to 26 meters.