West Connex M4 East Homebush Bay Drive and Parramatta Road Haberfield
Project Outline
Products / Services
Bored PilesWestconnex M4 East Project will join the M4 Widening from Parramatta to Homebush Bay Drive and to Parramatta Road Haberfield. CPB Samsung John Holland Joint Venture engaged Avopiling to undertake construction of the cut and cover tunnel retaining wall piles in this sections of M4 East Stage 1.
Scope of Works
Avopiling scope is to construct 34No x 750mmØ, 44No x 900mmØ, 393No x 1050mmØ and 22No x 1200mmØ bored piles to average depths of 20.00 meters at Homebush Bay Drive and 4No each of 450mmØ and 600mmØ, 89No x 900mmØ, 67No x 1050mmØ and 77No x 1200mmØ to 17.00 meters deep bored piles at Parramatta Road Haberfield.