West Connex M5N St Peters Interchange Bridge and Local Roads Structures
Project Outline
St Peter Interchange or SPI project consist of 9 bridges to be built on the previous Alexandria Landfill Facility. The interchange links to M4 and M5 and will have connections to Alexandria, Mascot and the local areas.
Scope of Works
Bored Piles is the preferrred foundation construction system for these bridges in anticipation of various materials buried in the old landfill. CPB Dragados and Samsung JV contracted Avopiling to perform segmental casing bored pile type of constructiion with 750 mm Ø, 900 mm Ø and 1050 mm Ø piles to depths of 19.00 meters to 46.00 meters.