40 O'Dea Avenue Waterloo
Project Outline
Products / Services
Sheet PilingThe project is a development by Crown Group, The project involves development of 4 properties adjacent to each that requires a retaining wall for a proposed crossroad through the development.
Scope of Works
Crown Group Constrction awarded the removal of exiting timber piles and installation of 685No of TKZ18-700 sheetpiles ranging from 12.00 metres to 18.00 metres to Avopiling Australia.