Rock solid.

Jewel Wentworth Point - Sydney Olympic Park Authority

Project Outline

The job site is adjacent to the Sydney Olympic Park Ferry Wharf bounded by Burroway and Hill Roads at Wentworth Point. The project is a luxury property development that consist of three 9 storey buildings with 3 basement levels of parking. 

Scope of Works

Avopiling Australia was awarded the contract by Dasco Australia to build a diaphragm wall retaining system.  The diaphragm wall depth ranged from 14.00 meters to 18.50 meters, socketing in some instances 5.00 meters into the sandstone. Panels were 800 mm wide and lengths ranged from 2.8 meters up to 7.10 meters, with a total wall length of 330 lineal meters. CFA piles were also installed outside the perimeter of the diaphragm wall.

Industry leading techniques and equipment

Our clients

  • Roads & Maritime
  • Department of Main Roads & Transport
  • Main Roads Western Australia
  • Transport for NSW
  • Queensland Rail
  • Sydney Water
  • Queensland Urban Utilities
  • Water Corporation
  • CPB
  • Lend Lease
  • John Holland
  • McConnell Dowell
  • OHL
  • Acciona Australia
  • Meriton
  • Brookfield Multiplex
  • Hutchinson
  • Probuild
  • JQZ Developer
  • Dragados
  • Samsung C&T
  • Bouygues Australia
  • Jaxon Construction
  • BMD
  • PTA WA
  • PTA WA 1