Penrith Goverment Office Building
Project Outline
The project entails the design and installation of secant pile wall made of 370No 600Ø CFA piles and 150No 125mmØ temporary anchors.
Scope of Works
Avopiling undertook the rock anchoring on this project, the third row of anchors consist of 90 rock anchors to depths of 12.5 metres. 8.0 metres bonded into rock at an angle of ± 30º